Few minutes of rain jam monster roads of Hyderabad
Posted August 1st, 2016, 11:32 AM IST

Hyderabad: It’s not just Delhi where rain can disrupt traffic for hours. Hyderabad has its monster roads where motorists are stuck for long durations. It gets worse when it rains.
Even on Saturday, vehicles crawled on the Begumpet road due to waterlogging in front of the Chief Minister’s camp office.
It is not just the number of vehicles or the condition of the roads. The structure of the carriageway, the narrow width of roads, illegal parking and encroachments apart from the Metro Rail and road widening works add up to the traffick snarls.
Traffic crawls in the first gear, the exhaust adding to atmospheric pollution and the engines contributing to the noise.
Besides, there are very few exits on the roads from where motorists can opt for alternative routes that can take the traffic load.
There are alternative roads in the IT corridor, Sardar Patel Road, the stretch from King Koti to Moazzamjahi Market, LB Nagar Inner Ring Road, Toli Chowki, Malkajgiri and JNTU-Kukatpally.
Mr Randolph Merandez, corporate employee working at Gachibowli, said, “A few minutes of rain will choke the traffic from Shilparamam crossing, through Kavuri Hills up to the Jubilee Hills check post. The traffic starts jamming from Nagarjuna Circle upto Paradise.”
The Metro Rail work is on throughout this stretch. At Ayyappa Society and Kavuri Hills, the roads are very narrow.
“The alternative route is through Hitec City, Kuktapally, Balanagar, Ameerpet and Begumpet. This too can get choked. Buses get struck while taking a U-turn at the JNTU crossroad, and this adds to the chaos,” he said.
Mr Laxman Rao, a resident of Red Hills, said, “The one-way Koti main road is always congested. The narrow stretch connecting it to Moazzamjahi Market is so narrow that traffic gets stuck at the signals for four cycles.”
The traffic on the Nampally station road adds to the pressure. “All along the Moazzamjahi Market up to the Assembly, Metro Rail work is on. From there to PVNR Expressway, it’s a traffic nightmare,” Mr Laxman Rao said.
The Malkajgiri road from Neerdmet crossroads to the Mini Tank Bund is one of the worst since 2014. Despite a World Bank water project, no new road has been laid.
Another monster stretch is from Secunderabad station to RTC crossroads and Narayanguda. “From Golconda crossroads upto Narayanguda junction especially at the RTC crossroads, the potholes are over 10 feet wide,” said Mr Nara Hari of Mettuguda.
Even on Saturday, vehicles crawled on the Begumpet road due to waterlogging in front of the Chief Minister’s camp office.
It is not just the number of vehicles or the condition of the roads. The structure of the carriageway, the narrow width of roads, illegal parking and encroachments apart from the Metro Rail and road widening works add up to the traffick snarls.
Traffic crawls in the first gear, the exhaust adding to atmospheric pollution and the engines contributing to the noise.
Besides, there are very few exits on the roads from where motorists can opt for alternative routes that can take the traffic load.
There are alternative roads in the IT corridor, Sardar Patel Road, the stretch from King Koti to Moazzamjahi Market, LB Nagar Inner Ring Road, Toli Chowki, Malkajgiri and JNTU-Kukatpally.
Mr Randolph Merandez, corporate employee working at Gachibowli, said, “A few minutes of rain will choke the traffic from Shilparamam crossing, through Kavuri Hills up to the Jubilee Hills check post. The traffic starts jamming from Nagarjuna Circle upto Paradise.”
The Metro Rail work is on throughout this stretch. At Ayyappa Society and Kavuri Hills, the roads are very narrow.
“The alternative route is through Hitec City, Kuktapally, Balanagar, Ameerpet and Begumpet. This too can get choked. Buses get struck while taking a U-turn at the JNTU crossroad, and this adds to the chaos,” he said.
Mr Laxman Rao, a resident of Red Hills, said, “The one-way Koti main road is always congested. The narrow stretch connecting it to Moazzamjahi Market is so narrow that traffic gets stuck at the signals for four cycles.”
The traffic on the Nampally station road adds to the pressure. “All along the Moazzamjahi Market up to the Assembly, Metro Rail work is on. From there to PVNR Expressway, it’s a traffic nightmare,” Mr Laxman Rao said.
The Malkajgiri road from Neerdmet crossroads to the Mini Tank Bund is one of the worst since 2014. Despite a World Bank water project, no new road has been laid.
Another monster stretch is from Secunderabad station to RTC crossroads and Narayanguda. “From Golconda crossroads upto Narayanguda junction especially at the RTC crossroads, the potholes are over 10 feet wide,” said Mr Nara Hari of Mettuguda.
- Kiara Advani, Sidharth Malhotra embrace parenthood for the second time
- Amitabh Bachchan admits difficulty decoding Gen Z slang
- Yash takes out extra time time to pose for selfies with fans before leaving Mumbai airport
- Bollywood stars shower blessings on Anshula Kapoor Rohan Thakkar at wedding reception
- Shilpa Shirodkar recalls losing Chaiya Chaiya with SRK
- Watch Russian couple dramatic proposal atop Empire State Building sparks global buzz
- Aamir Khan says his wedding with partner Gauri Spratt will be intimate affair with family and friends
- Actress Sreeleela recalls balancing MBBS medical exams with Viral Vayyari song shoot on Doctors Day
- US removes four Indian firms from sanctions list
- Suriya joins hands with T J Gnanavel for new hombale films project
- US Iran agree to sustain Strait of Hormuz ceasefire resume broader nuclear talks
- Telangana Governor CM Revanth Reddy urge people to join fight against drug abuse
- Samantha Confirms Pregnancy Shares Maternity Leave Plans Have To Take A Small Break
- Allu Arjun to appear in court on Monday in Sandhya Theatre stampede case
- Yoga centres to be set up in all villages announces CM Chandrababu Naidu
More News
Photos
Latest
- Kiara Advani, Sidharth Malhotra embrace parenthood for the second time
- ‘Sometimes we get addicted to our own greatness’: Manoj Bajpayee
- Dulquer Salmaan’s ‘Aakasamlo Oka Tara’ gets November 20 release date
- ‘Mirzapur: The Movie’ crosses Rs 100 crore at domestic box office in opening weekend
- Amitabh Bachchan admits difficulty decoding Gen Z slang
- Watch: Nagarjuna releases trailer of Allari Naresh-starrer ‘Ramba Oorvasi Menaka’
- “Tum bahut lambe ho…”: Big B shares struggles of early acting days
- Nayanthara reveals how Geethu Mohandas convinced her to join ‘Toxic’
- Sonu Nigam says childhood anger fuelled his passion and shaped his singing career
- Yash takes out extra time time to pose for selfies with fans before leaving Mumbai airport
A PHP Error was encountered
Severity: Warning
Message: file_get_contents(http://www.indiaaffiliates.in/ads.php?size=300X250): failed to open stream: Connection refused
Filename: views/newsdetails.php
Line Number: 57
Backtrace:
File: /home/sites/43a/5/599366ad77/public_html/application/views/newsdetails.php
Line: 57
Function: file_get_contents
File: /home/sites/43a/5/599366ad77/public_html/application/controllers/News.php
Line: 135
Function: view
File: /home/sites/43a/5/599366ad77/public_html/application/controllers/News.php
Line: 95
Function: newsdetails
File: /home/sites/43a/5/599366ad77/public_html/index.php
Line: 315
Function: require_once
Opinion Poll
Videos














